Faced with tight access and a high-risk excavation, Legend Hire engineered a non-invasive tilt prop brace support system using power pole clamps, concrete counterweights, and Vertishore shoring. Our integrated approach...
Legend Hire engineered a temporary wall bracing solution to stabilise a damaged concrete wall during cut-out and repair works in New South Wales. Working across uneven ground and wall surfaces,...
At Carlton North Primary School, Legend Hire installed temporary structural propping to safely support a load-bearing wall and full-length beam, allowing contractors to enlarge the wall opening and install a...
When tight access and difficult ground conditions ruled out a standard approach, Legend Hire engineered a bespoke clamping bracket and modular propping system to safely support a multi-storey balcony for...
When a commercial fit-out required the removal of permanent structural steel ties, Legend Hire designed and installed custom Tilt Prop Braces with a through-bolt connection to safely prop non-standard SHS...
A residential project in Sydney required urgent structural intervention when a primary steel beam deflected beyond tolerance under load. Legend Hire engineered a controlled temporary propping and hydraulic jacking solution,...