Project Overview
Legend Hire was engaged to design and install a temporary back propping system beneath an existing car park slab at Southbank Parklands ahead of a large public concert. With a substantial stage structure, production equipment and thousands of attendees expected above the suspended slab, organisers needed confidence the structure could safely manage the additional loads.
The solution reinforced the slab, ensured public safety, and was delivered within a tight pre-event installation window.

Engineering challenge
The project presented multiple engineering and logistical limitation:
- Significant temporary live loads from stage infrastructure, rigging and crowd density
- Uncertainty regarding the slab’s capacity under peak event conditions
- Requirement for a temporary works solution compliant with public safety expectations
- Tight installation timeframe ahead of the scheduled event
Failure to adequately manage load transfer posed risks to structural integrity and event continuity.
Temporary back propping solution
Legend Hire delivered a purpose designed back propping system engineered to safely redistribute loads from the suspended slab to the supporting structure below.
Installed System
- 220 × Legend Multi Prop MP350
- 440 × ¼ sleepers installed top and bottom
The sleeper configuration increased the load distribution footprint, reducing point loading and enabling controlled, even transfer of forces through the propping system.
This approach ensured the temporary works solution functioned as an integrated structural support system rather than isolated props.

Outcome and client benefits
The back propping system was installed on time and performed as designed throughout the event. The suspended slab carried the full stage and crowd loads without issue, and event organisers had the structural assurance they needed to proceed with confidence.
The installed system successfully delivered:
- Reinforced structural capacity to manage temporary high loads
- Compliance with safety requirements for a major public event
- On-time installation within strict project deadlines
- Confidence for organisers to proceed with the concert safely
The project demonstrated the effectiveness of engineered temporary works in supporting high-risk event infrastructure within existing structures. Legend Hire – engineered temporary works, delivered on time.
Legend Hire brings years of hands-on experience in delivering safe, efficient, and innovative solutions for complex projects. With a deep understanding of structural challenges and a commitment to excellence, we ensure every installation meets the highest standards. To see our expertise in action, watch this video, with real customer feedback.