Overview
Elecnor Group, a global infrastructure and energy company, selected OMAC Italy to supply equipment for a high-demand underground power upgrade in Dakar, Senegal. The decision was based on OMAC’s ability to provide reliable machinery and on-site technical support.


Why Elecnor Chose OMAC
Elecnor purchased directly from OMAC Italy after assessing its:
- Performance history in cable installation projects
- Technical support offering, including commissioning and training
- Fit-for-purpose equipment tailored to underground cable work
OMAC supplied a complete equipment package, with support personnel deployed on-site in Senegal.
Equipment Supplied
- 150 kN Hydraulic Puller (F245.150.P) – For high-tension underground cable pulling
- 500 kN Reel Stand (F155.A.500) – For handling large cable drums
- Hydraulic Power Unit (F306.18.CC) – For powering hydraulic tools on-site


On-Site Support
OMAC technicians trained Elecnor’s operators in Dakar, covering machine operation, safety, and basic maintenance. This helped reduce delays and ensured smooth equipment integration.
Outcome
The OMAC package enabled Elecnor to carry out the Dakar underground power upgrade with minimal issues and high equipment reliability. The project benefited from a clear handover process and dedicated technical support during early operations.