Project: Back propping a suspended concrete slab for EWP access
Location: Lidcombe, NSW
Sector: Commercial construction
Client: Total Construction
Services Provided: Equipment hire, installation
Equipment Used: Legend Multiprops, timber bases
Project Overview
Total Construction needed a suspended concrete slab at its Lidcombe project back propped to allow elevating work platforms (EWPs) to travel across it. The props were needed urgently to keep the program on track. Legend Hire had its installation team on site within 48 hours and installed a back propping system using Legend Multiprops beneath the slab, giving Total Construction the temporary structural support it needed for EWP movement while keeping the project free of delays.


The Challenge
Total Construction needed to operate EWPs on a suspended concrete slab at its Lidcombe project, and back propping was required beneath the slab before the EWPs could travel above.
Timing was the critical constraint. The props were needed on site urgently, and any delay in getting support in place would have held up the works.

The Solution
Legend Hire mobilised its installation team to site within 48 hours of the request. The team installed Legend Multiprops beneath the suspended slab, set out in a regular grid between the slab’s columns, with each prop bearing on hardwood timber sleepers.
Equipment Used
- Legend Multiprops, adjustable props installed between the floor below and the slab soffit
- Timber bases beneath each prop
The Outcome
The back propping was installed without holding up the program, and Total Construction’s EWPs could travel across the suspended slab while works continued safely.
Legend Hire has delivered back propping for other temporary loads on suspended slabs, including crane back propping on a suspended slab in Sydney, temporary back propping for a high-load event at Southbank Parklands, and suspended slab propping in an occupied apartment building.
Frequently Asked Questions
Temporary props installed beneath a suspended slab to carry additional loads down to the structure or ground below.
EWPs apply concentrated wheel loads, which can exceed what a slab was designed to carry. Whether props are required, and how many, is set by a temporary works assessment.
On this project the installation team was on site within 48 hours.