Temporary steel propping and transfer beams kept the structure fully supported while excavation went ahead underneath. The images show how the load was carried safely from demolition through to new footings.

Project Details

  • Project: Club Maitland City Expansion
  • Location: Rutherford, NSW 2320
  • Sector: Hospitality & Recreation
  • Builder: INTREC Management (NSW) Pty Ltd
  • Services Provided: Temporary works engineering, site investigation, propping hire
  • Equipment Used: Legend 100T Modular Propping, Legend 50T Modular Propping, hydraulic jacks, steel transfer beams, Steel Tilt Props, Multiprops

Project Overview

INTREC engaged Legend Hire to engineer and supply temporary propping for the expansion of Club Maitland City in Rutherford, NSW. The alterations required an existing load-bearing wall to be removed and rebuilt.

That wall supported the structural columns carrying the clubhouse’s entire rear facade. A major internal column supporting the suspended slabs and roof also had to be underpinned. Legend Hire designed a facade propping system using Legend 100T and 50T Modular Propping with hydraulic jacks, steel transfer beams, Steel Tilt Props and Multiprops. The system provided an alternative load path to ground while both elements were rebuilt.

The Challenge

As part of the club alterations, INTREC needed to demolish and rebuild a load-bearing wall beneath the rear facade. The wall supported the structural columns carrying the facade above. At the same time, a major internal column supporting all internal slabs and the roof had to be underpinned. Both elements were carrying full building loads throughout the works.

Three site conditions complicated the temporary works design:

  • Incomplete structural information. The existing load paths through the older structure could not be assumed from the available documentation.
  • Variable ground conditions. The props bore on disturbed fill next to open underpinning excavations.
  • Restricted access. Space beneath the facade overhang and around active excavations limited where towers and bracing could be positioned.

The Solution

Legend Hire’s engineering team carried out a detailed site inspection to establish how loads were being transferred through the existing structure. The propping system was designed around that inspection:

  • Facade support. Steel transfer beams were carried on Legend 100T and 50T Modular Propping towers. This picked up the facade columns and transferred their load to ground, independent of the wall being demolished.
  • Hydraulic jacking. Hydraulic jacks at the tower heads and bases allowed the props to be loaded up against the structure before the wall and footing were removed. This limited movement during load transfer.
  • Lateral restraint. Steel Tilt Props were installed as raking braces to restrain the columns and towers once the wall’s bracing was lost.
  • Secondary support. Legend Multiprops supported the slab soffits and secondary elements around the works area.

Engineering Considerations

  • Establishing load paths in an existing structure with limited documentation
  • Founding props on variable ground next to open underpinning excavations
  • Using hydraulic jacking to control deflection as load moved from the permanent structure to the temporary works
  • Restraining tall towers and exposed columns laterally once the wall was removed

Equipment Used

  • Legend 100T Modular Propping System
  • Legend 50T Modular Propping System
  • Hydraulic jacks
  • Steel transfer beams
  • Legend Steel Tilt Props
  • Legend Multiprops

The Outcome

The Legend Hire propping system carried the rear facade and the internal column for the duration of the works. This allowed INTREC to demolish and rebuild the load-bearing wall and complete the column underpinning safely, keeping the club’s expansion on track.

Frequently Asked Questions

What is facade propping?

Facade propping is temporary works that carry the load of a building’s external wall or facade while its permanent support is removed, altered or rebuilt. It typically combines modular propping, steel transfer beams and raking props to create an alternative load path to ground.

How is a structural column supported during underpinning?

The column’s load is transferred to temporary props, usually through steel beams carried on jacked modular propping towers. Once the props are loaded, the existing footing can be excavated and replaced while the structure above remains supported.

Why are hydraulic jacks used with modular propping?

Hydraulic jacks allow props to be loaded up against the structure before demolition or excavation starts. The temporary works then take the load immediately, which limits settlement and movement when the permanent support is removed.

What is the difference between 50T and 100T modular propping?

The rating refers to each tower’s working load capacity. Legend 50T Modular Propping suits most wall, slab and column support. Legend 100T Modular Propping is used where concentrated loads are higher, such as facade columns, transfer beams or crane outriggers. Many projects combine both.

Planning Structural Alterations or Underpinning?

Legend Hire engineers and supplies modular propping, hydraulic jacking and tilt prop systems for facade, column and wall support across NSW, QLD and VIC. Send through your drawings or site details for an engineered propping solution. Call 1300 890 890 or Email legends@legendhire.com.au

Share Article

Get Your Quote

Before leaving, check out our catalogue!