Get Your Quote

Fortitude Valley Foundations – Secured the Legend Way

Alder Group Basement Project, Fortitude Valley QLD

Project Overview

Legend Hire provided lateral support for basement carpark columns on a tight inner-city site.
The goal: maintain structural stability while upper-level works continued.

The Challenge

  • Confined basement access.
  • Concurrent structural activity above.
  • Precise load management needed under active site conditions.

The Solution

Design

  • Engineered layout designed to absorb and transfer lateral forces safely.
  • Considered column spacing, beam loads, and ground restraint.

Supply

  • Heavy-duty bracing systems and steel props with base plates.
  • Fully tagged and compliant components.

Installation

  • Installed by Legend Hire’s experienced field team with close coordination alongside Alder Group.
  • Adherence to project SWMS and QA procedures.

Inspection & Handover

  • Inspection and certification by structural engineer.

The Outcome

  • Stable structure achieved with zero disruption.
  • Project proceeded on time and within spec.
  • Another day, another Legendary hold-up.

Share Article

Get Your Quote

Before leaving, check out our catalogue!