Powering Renewable Energy Progress

Legend Hire & OMAC Italy Deliver Under Pressure

In the fast-paced world of energy infrastructure, deadlines are fixed and reliability is essential. When a client in Muswellbrook, NSW, needed equipment for a renewable energy transmission tie-in project near a major power station, they approached Legend Hire. The solution came in the form of newly arrived OMAC Italy 10T Puller Tensioners—marking the first time these machines had been deployed in Australia.

This project became both a test of OMAC Italy’s equipment in local conditions and an example of how the right preparation and support can keep high-stakes projects on track.

The Challenge

  • Tight deadline: Equipment needed on site and operational by Friday afternoon to meet mobilisation plans.
  • New technology: The client had never used OMAC Italy machines before and had long relied on other brands.
  • Freight delays: Three 40ft containers were still in transit, creating a real risk of missing the deadline.

With the stringing of single and twin conductors being a critical path task, any delay could cause significant setbacks for the overall project schedule.

The Response

Legend Hire took a hands-on approach to keep the project moving:

  1. Maintained clear communication with the client throughout the shipping process.
  2. Coordinated with freight partners to secure a rare early-morning port release and immediate transport to our Penrith branch.
  3. Had a prepared crew ready with tools, fluids, fuels, and OEM support in place before the containers arrived.

Within six hours of delivery, the OMAC Italy machines were:

  • Unpacked
  • Fully serviced
  • Inspected and tested
  • Ready for collection at 1:00 PM that same day

First Impressions & Operator Training

Legend Hire technicians stayed on site over the weekend to assist with setup of the puller/tensioners, reel trolleys, and drum elevators. On Sunday, an OMAC Italy specialist provided hands-on training for the operators.

By Monday, initial hesitation had shifted to positive feedback:

“These machines are fantastic to operate. We can’t believe there wasn’t another option like this before.”

Operators noted:

  • Easier controls and faster learning compared to competing brands
  • Features and functions not previously available in their fleet
  • Smooth, precise performance in challenging conditions

The Pull: Tight Space, Twin Conductors, 90-Degree Bend

The real test came during live operation:

  • Tight pole spacing
  • A sharp 90° bend in the alignment
  • Triple sheave block and balancing headboard requirements

Despite concerns about clearance, the OMAC Italy 10T Puller/Tensioners delivered:

  • Consistent pulling power
  • Fine control for delicate manoeuvres
  • Adaptability to changing site needs

The outcome was an on-time, incident-free completion of a complex and high-risk pull.

Results & Impact

  • First operational use of OMAC Italy puller/tensioners in Australia
  • No downtime despite freight challenges
  • Full operator competence before live operation
  • Strong customer confidence leading to potential future projects

Why It Matters

This was more than a standard equipment hire—it demonstrated:

  • The capability of OMAC Italy technology in Australian transmission line projects
  • The value of detailed preparation and technical support in meeting deadlines
  • A contribution to renewable energy infrastructure in Australia