Elecnor Group, a global engineering and construction firm, recently expanded its equipment fleet for high-capacity aerial and underground line installation projects. Working with an OMAC distributor, Elecnor commissioned a new lineup of hydraulic machinery directly from OMAC Italy’s factory, including hands-on technical training and validation at OMAC’s headquarters.

Overview

Elecnor Group, a global engineering and construction firm, recently expanded its equipment fleet for high-capacity aerial and underground line installation projects. Working with an OMAC distributor, Elecnor commissioned a new lineup of hydraulic machinery directly from OMAC Italy’s factory, including hands-on technical training and validation at OMAC’s headquarters.

The Challenge

To support its international transmission projects, Elecnor required equipment that could:

  • Handle both aerial and underground line stringing
  • Deliver high pulling capacity with reliable hydraulic performance
  • Ensure operational safety and ease of use for field crews
  • Offer long-term durability and maintainability

These specifications were necessary for consistent performance across varied geographies and demanding conditions.

The Solution

OMAC Italy delivered a tailored fleet of hydraulic winches and reel handling equipment. The commissioning process included factory acceptance testing and in-person training at OMAC’s Italian facility.

Equipment Supplied:

  • F230.80 – Hydraulic winch, 8-ton capacity
  • F245.100 – Hydraulic winch, 10-ton capacity
  • W30 – Hydraulic winch for service work, 3-ton capacity
  • F155.A.300 – Hydraulic reel winder, 30-ton capacity

Each unit was configured to meet Elecnor’s application requirements, with emphasis on usability, operator control, and reliability in the field.

Commissioning & Training

OMAC provided technical training to ensure operators were familiar with:

  • Equipment functionality and controls
  • Routine maintenance and troubleshooting
  • Safe handling during line stringing operations

The session ensured Elecnor’s teams were prepared to deploy the machines immediately upon delivery.

Results

  • Smooth deployment following factory validation
  • Increased equipment readiness for upcoming projects
  • Operator familiarity established prior to site work
  • Reinforced collaboration between equipment supplier and field contractor