Project Overview
When a heritage restoration project required immediate backpropping for three levels of suspended slabs, Legend Hire was called in to act fast.
Our team designed, mobilised, and installed a custom system that supported ongoing work without delays.

The Challenge
- Tight project timeline — works already underway.
- Heritage structure requiring minimal intervention.
- Three suspended levels needing safe load support.
The Solution
Design
- Rapid in-house engineering response to design backpropping layout.
- Full compliance with AS 3610 and AS 4100.
Supply
- Adjustable steel props and bracing configured for multi-level loads.
- Certified and tagged components pre-tested for immediate use.
Installation
- Installation completed without interrupting the restoration works.
- Safe Work Method Statements (SWMS) implemented and monitored.
Inspection & Handover
Structural engineer verification and certification upon completion.


The Outcome</h3>
- Works continued on time and safely.
- Heritage integrity preserved.
- Legend Hire demonstrated reliability and responsiveness under pressure.