Pad Building & Maintenance needed a live car park slab in Westmead back propped so a 60T mobile crane could travel across it. Legend Hire designed back propping using Legend...
Plexxcon needed six severely damaged structural columns propped urgently at an occupied industrial site. Legend Hire inspected the site 24 hours ahead, then installed braced props at each column so...
A customer needed its OMAC F280.40.P hydraulic puller diagnosed, repaired and ready for an upcoming project within one week. Legend Hire’s Stringing & Winching team sourced parts, repaired the faults,...